Forced Rite

A rapid protocol of direct strikes, containment wards, and immediate removal intended for emergencies or hostile seams.

The method is attributed to peoples who valued survival and speed above reverence for the deep earth.

Section
Rites of Extraction
Rite Type
Extraction
Method
Forced
Purpose
Obtain material quickly when negotiation with the vein is impossible or time is critical.
Requirements
Impact-rated tools, an evacuation route, structural containment, and legal authorization where required.
Steps
Secure exits; place wards; fracture the seam; remove the target material; withdraw before the second pulse.
Duration
5–20 minutes
Risks
High probability of collapse, awakening, contamination, or permanent damage to the vein.
Benefits
Fast access and the highest immediate yield.
Participants Needed
4–12
Offerings
None.